Under joists
- This will divert most of water out of the deck area
- Limitation: will not protect joist structure so as on top of the joists installation.
- Read and follow warnings on
https://goberco.com/products/warnings.html before each installation.
Material and tools:
Deck Membrane roll, window caulking, plastic run-out or run-out connector, neophrene washer roof screw, stapler, level, scisor, knife, caulking gun.
If joist are leveled you will need to slope these by adjusting posts or adding a strip ( composite wood ) under each joist, such strip trimed to get proper slope. Proper drainage slope is between 1/8'' per foot (1%) and 1/4'' per foot (2%). Then add a thick caulking strip under each joist so as under ledger board and rim joist.
Cut a piece of membrane at the desired length (to cover joist + ledger board + rim joist).
Install the plastic gutter run-out, start by making an X cut (make sure to not over cut).
Secure the plastic gutter run-out to the membrane with 4 neophrene washer roof screws. We suggest to install the gutter run-out between 10'' to 16'' from rim joist.
Staple the membrane under the joists, the Z folds are in closed position against the ledger boards and under the rim joist.
Add a 1'' x 2'' plank screwed every 10'' over each membrane joint to support potential membrane load (water, debris, iceā¦) or under high wind conditions. To reduce leaks coming around screws make sure to have these thru caulking strip.
We pulled out some deck boards to show a top view of the drain membrane in place.